UK Trunk Sewer C, D, and E

FAYETTE COUNTY, KY

WATER RESOURCES

As part of the LFUCG Division of Water Quality (DWQ) Consent Decree, Palmer Engineering and its sub-consultants were selected to design UK Trunk Sewers C, D, and E, outlined in the Remedial Measures Plan. This critical project is located in a dense urban area of Lexington, running through portions of the University of Kentucky campus and several major city streets.

Project Overview

The sewer alignment begins at Chair Avenue and extends to High Street, with the majority of construction occurring in the right-of-way along Chair Avenue, Oliver Lewis Way, Bolivar Street, S. Upper Street, Avenue of Champions, Rose Street, and Euclid Avenue. A section will also pass through a sanitary easement on the UK campus near Winslow Street.

Design Challenges

Because of its location in one of the busiest parts of Lexington, the project was considered one of the most challenging line-work efforts in the Remedial Measures Plan. The design team evaluated multiple construction options to balance traffic impacts, costs, and constructability, including:

  • Traditional dig-and-replace gravity sewer

  • Micro-tunneling approaches

  • New pump station and force main

Palmer provided cost estimates and traffic impact analyses for each alternative. Ultimately, DWQ selected the dig-and-replace method as the most effective solution.

Rose Street at the University of Kentucky.

Sewer Design Details

The UK Trunk C, D, & E project includes:

  • 205 LF of 8-inch sanitary pipe

  • 71 LF of 10-inch sanitary pipe

  • 94 LF of 12-inch sanitary pipe

  • 25 LF of 15-inch sanitary pipe

  • 80 LF of 18-inch sanitary pipe

  • 4,208 LF of 21-inch sanitary pipe

  • 1,822 LF of 24-inch sanitary pipe

  • 1,898 LF of 27-inch sanitary pipe

  • 595 LF of 30-inch sanitary pipe

  • 67 manholes (4–6 feet in diameter)

Final design was completed, and the project was advertised for bid on September 26, 2019.

Scope of Work

Palmer Engineering’s responsibilities included:

  • Site evaluation and tree survey

  • Topographic survey and property line verification

  • Rock soundings and alternative evaluation

  • Preliminary design, plans, and profiles

  • Maintenance of traffic evaluation

  • Construction plans and project specifications

  • Stormwater pollution prevention planning

  • Cost estimation and easement acquisition assistance

  • Bidding and construction administration

  • Record drawings

Sewer construction project at the University of Kentukcky.

Key Team Members

  • Brian Ward, PE, PLS

    TEAM MEMBER

  • Stephanie Blain, PE, LEED AP

    TEAM MEMBER

Previous
Previous

Vaught Tributary of Lower Howards Creek Stormwater Model Extension and Study

Next
Next

Vision Zero Louisville Safety Action Plan